Malangwa Community Hall — Municipality Project
Our Projects

Malangwa Community Hall — Municipality Project

InstitutionalMalangwa — 2022Client: Malangwa Municipality

Project Overview

A 4,500 sq ft community hall built for Malangwa Municipality with a 500-person seating capacity. Features include a raised stage with green room, pre-wired sound system infrastructure, commercial kitchen for catering, separate male and female washrooms, ample parking area, and ramp access for persons with disabilities. Built with pre-engineered steel truss roofing for the large span, M25 concrete floor, anti-skid tiles, acoustic ceiling panels for better sound quality, and heavy-duty electrical system for event lighting. Completed in 10 months.

Key Features

500-person capacity hall
Stage with green room
Sound system wiring
Commercial kitchen
Separate washrooms
Parking area
Ramp access for disabled

Materials Used

Pre-engineered steel truss roof M25 concrete Anti-skid floor tiles Acoustic ceiling panels Heavy-duty electrical

Project Photo Gallery

Malangwa Community Hall — Municipality Project — Photo 1
Malangwa Community Hall — Municipality Project — Photo 2
Malangwa Community Hall — Municipality Project — Photo 3

Project Details

Location

Malangwa

Completion Year

2022

Built-up Area

4,500 sq ft

Floors

1

Project Duration

10 months

Project Budget

NPR 65 Lakhs

Want a Similar Project?

We can build something like this for you. Get a free consultation and cost estimate for your project.

Get Free QuoteCall +977-9844201232

Ready to Build Your Dream Home?

Contact us today for a free consultation and detailed cost estimate. No obligation, no pressure — just honest construction advice from 30+ years of experience.